Work Contract Tenders in Mumbai
maharashtra , mumbai
- refilling charges, custom bid for services - transportation charges, custom bid for services - hydrotesting spares repairs charges
- transportation, courier, cargo services
- Deadline : 22 Apr 2024
- Classification : Work Contract
- Value : Refer Document
maharashtra , mumbai
- supply and installation of sub equipotential earth bus bar size of each seeb 150x25x6 mm (min.) copper strip. purity not less than 90%.
- steel structure and fabrication
- Deadline : 06 May 2024
- Classification : Work Contract
- Value : Refer Document
maharashtra , mumbai
- supply and installation of main equipotential earth bus bar size of each meeb 300x25x6 mm (min.) copper strip. purity not less than 90%.
- steel structure and fabrication
- Deadline : 06 May 2024
- Classification : Work Contract
- Value : Refer Document
maharashtra , mumbai
- supply of installation job for earth pit including inspection chamber earth pits will be of conventional type of the size of 1meter diameter and 3meter depth shall be excavated, after depth of 3 meter, the size of excavation shall be 900x300x900mm depth.
- miscellaneous
- Deadline : 06 May 2024
- Classification : Work Contract
- Value : Refer Document
maharashtra , mumbai
- supply of installation and laying of copper strip for earth grid supplied copper strip shall be buried at least 2 ft under ground and all the earth pits to be interconnected.
- steel structure and fabrication
- Deadline : 06 May 2024
- Classification : Work Contract
- Value : Refer Document
maharashtra , mumbai
- supply of installation and laying of copper strip from earth grid to building total distance from grid to building is 55meter. each strip will run through 1.5inch hdpe pipes to be laid inside closed underground ducts. all strip joints needs to be suitably
- steel structure and fabrication
- Deadline : 06 May 2024
- Classification : Work Contract
- Value : Refer Document
maharashtra , mumbai
- supply of installation and laying of copper strip from ups panel room at ground floor to all the rooms in all the floors of the building and also to the roof area of the building the supplied copper strip earth conductors shall be fixed to the wall or col
- steel structure and fabrication
- Deadline : 06 May 2024
- Classification : Work Contract
- Value : Refer Document
maharashtra , mumbai
- supply of pump cent hor oh2 eth 50m3 per hr 60mlc for malkapur pol installation
- miscellaneous
- Deadline : 08 May 2024
- Classification : Work Contract
- Value : Refer Document
maharashtra , mumbai
- supply of pump cent hor oh2 eth 100m3 per hr 60mlc for malkapur pol installation
- miscellaneous
- Deadline : 08 May 2024
- Classification : Work Contract
- Value : Refer Document
maharashtra , mumbai
- supply of pump cent hor oh2 hsd 200m3 per hr 50mlc for malkapur pol installation
- miscellaneous
- Deadline : 08 May 2024
- Classification : Work Contract
- Value : Refer Document